Vertical Stabilizer Complete!
Normally this is the first piece completed from the empennage kit. And that is true for me too, despite having
Vans RV-10 Aircraft
Normally this is the first piece completed from the empennage kit. And that is true for me too, despite having
Pulled down the Vertical Stabilizer Skin which has been sitting on a shelf for the last two months. There were
Continued and finished riveting the doubler and spar caps to the Rear Spar of the Vertical Stabilizer. I had previously
Now that I have my backordered parts, namely the rudder brackets, I can take another stab at the Vertical Stabilizer.
Just a little bit of work on the Vertical Stabilizer. I am still blocked waiting for backordered parts… the rudder
A lot of hours spent today on stuff that’s not super visible. Oh, turns out I was able to fit
A good chunk of time put in today on the Vertical Stabilizer. Started by doing some match drilling (#30) of
Just a little bit of work tonight after work… match drilling #40 between the VS rear spar flanges and the