HS Spar Work
Continued work on the spars for the horizontal stabilizer. One last task on the rear spar — assembling the elevator
Vans RV-10 Aircraft
Continued work on the spars for the horizontal stabilizer. One last task on the rear spar — assembling the elevator
In the last post, I mentioned that all the holes for the horizontal stabilizer spars and doublers were already final
Started work on the horizontal stabilizer today. Time was spent on the very tedious task of deburring. I worked on
It has not even been six months ago that I built my mobile workbenches. Well, unfortunately, one of them hasn’t
Took it a little easy on the build this month so I could focus on preparing, interviewing and ultimately accepting
Started by drilling out and replacing some rivets in the bottom skin that were either grossly overdriven or bent/sheared. Then
Finished riveting the left side tailcone skin to the stiffeners, frames and bulkheads. All within reach with my little stepladder.
Started riveting a little more of the left tailcone to the stiffeners. Pretty much did the top row, then moved
Went to the hangar for a couple hours of working on the plane. Started by dimpling the nut plate rivet
The left tailcone longeron was removed and deburred and countersunk where required. The aft top deck was also deburred. Then