Right Wing Rib Matching
Today was fun because I could, for the first time, get a nice sense of the scale of the wings.
Vans RV-10 Aircraft
Today was fun because I could, for the first time, get a nice sense of the scale of the wings.
Pretty much just some match drilling on this day. The flap hinge brackets needed to be match drilled to a
A little bit of match drilling on a couple of brackets today. But most of the time was spent “fluting”
Started by cleaning up some of the inner holes of the countersinks for the screw holes. I was careful to
Close to wrapping up the right spar prep. This involved countersinking the screw holes. Then installing the 5 nutplates on
Aaah, the wings. Every time I complete several steps on one, it’s time to do the same thing all over
This entry includes time spent on 9/13 and 9/15 as well (evenings). Wrapping up the left wing spar prep involved
Today was spent riveting nutplates to the left wing spar. Two different sizes, one size for the fuel tank attachment
Well, over 2 hours positioning and drilling the four J-channels that use the left wing spar as a template. Then
This entry is for 1.5 hours on 8/31 and 2.5 hours on 9/2. There are 8 J-stiffeners that needed to