Section 14 Complete
This log entry includes work done on both Sat Mar 26 and Sun Mar 27, 2022. The very time consuming
Vans RV-10 Aircraft
This log entry includes work done on both Sat Mar 26 and Sun Mar 27, 2022. The very time consuming
Riveted the left main ribs onto the left wing spar. This went quite well, but a few had to be
A bunch of riveting to get the various brackets onto the left wing ribs. This consisted of flap hinge brackets
Deburred, prepped and primed the remaining 9 aft wing ribs for the left wing. Very tedious.
Started the tedious process of deburring and priming the left wing aft ribs. There are 15 of these on each
Finally resuming work on the left wing. It was a beautiful day today and nice and warm in the hangar.
I strained my back, so I have to take a several week break from building. Why? Because it got so
It’s time too start work on attaching ribs to the left wing strut, however, the right wing strut is currently
Riveted the right main ribs onto the right wing spar. This went quite well, and only 2-3 had to be
Primed and assembled the aileron brackets (for both wings). Then the one for the right wing was attached to the