Mid Spar Aft Portion Assembly Complete

Chris's avatarPosted by

Work done on Sat 18 Mar 2023 and Sun 19 Mar 2023.

Finished preparing all the parts for assembly onto the Aft Portion of the Mid Spar. This included all the missed match drilling, edge deburring, hole deburring and priming.

Then got everything re-assembled and riveted! Easier access to have the manufactured heads on the spar side, but I’m always nervous about riveting (versus bucking) on that side since it’s an expensive part! But I’m happy with the results. The bolts/washers/nuts were installed as well, and just have to be final torqued.

Leave a comment