Wing J-Channels

Chris's avatarPosted by

This entry is for 1.5 hours on 8/31 and 2.5 hours on 9/2.

There are 8 J-stiffeners that needed to be cut to length. I did this and deburred the edges. Then they need to have holes drilled. The plans call for using the wing spar flanges (with a little offset) as a template for drilling, even though this is not where they will be attached. There are literally hundreds of holes to drill. So I only managed to get through drilling the 4 J-channels that were using the right wing spar as a template.

Leave a comment