Spent time today match drilling the replacement left longeron. A lot of drilling!
Then I attached the two top skins, in preparation for final drilling of the skins + left longeron.




Vans RV-10 Aircraft
Spent time today match drilling the replacement left longeron. A lot of drilling!
Then I attached the two top skins, in preparation for final drilling of the skins + left longeron.



